Country and Project name: Date:


Works for SES TLMAČE Slovak boiler Company :

Czech Republic, Steelworks Třinec 1993/1994

Fluidized bed boiler with capacity 160 t/h of steam


Czech Republic, Power Plant Tisova, 1995/1996

Fluidized bed boiler with capacity 350 t/h of steam


Slovak Republic, BEBA Bánovce nad Bebravou, 1997

Boiler house, 2x4t/h, 1,2MPa, 230°C


Slovak Republic, Petrochema Dubová, 1998

Boiler house, 2x4t/h, 1,2MPa, 230°C


Slovak Republic, PPC Bratislava, 1998

Cogeneration Power Plant

HRSG Boiler , 235 t/h, 8 MPa, 520°C


Czech Republic, Power Plant Praha Malešice, 1998/1999

Coal Steam boilers 2 x 180 t/h, 9,6 MPa, 540°C


Slovak Republic, AD Štúrovo, 1999

Coal Steam Boiler , 125 t/h, 9,6 MPa, 540°C


Czech Republic, Power Plant Vresová, 1999/2000

Coal Steam boiler 325 t/h, 13,5 MPa, 540°C


Slovak Republic, EVO - Vojany, 2000

Fluidized bed boilers with capacity 2 x 325 t/h, 14,6 MPa, 540°C


Slovak Republic, Bučina Zvolen, 2001

Boilers for wood chips with capacity 2 x 16 t/h, 2,8 MPa, 380°C

Job position : Commissioning engineer, Service and start-up engineer ,


Works for ISTROENERGO GROUP Slovak Company :

Czech Republic, Power Plant České Budejovice, 2002

Coal Steam boiler 325 t/h, 13,5 MPa, 540°C


Turkey,AK ENERJI - IZMIR BATICIM , 2002/2003

Cogeneration Power Plant 43 MWe total power output

6 x GT Typhon 5,2 MWe

2 x HRSG dual pressure (3 x GT to one HRSG) + 1 x ST 16 MWe


Turkey, AK ENERJI – USAK 2003

Upgrading of USAK plant efficiency


Slovak Republic, Plastika Nitra, 2003

Steam Boiler , LOOS 1x8t/h, 1,2MPa, 220°C


Slovak Republic, SH – ENERGO Senica, 2003/2004

Boiler house, HKB 2x25t/h, 1,2MPa, 240°C


Poland, PEC Wysków

Waste Heat Hot Water Boiler 1 x 4,3 MWt 2003/2004

for Cogeneration Plant PEC Wyszków


Czech Republic, Steelworks Třinec, 2004

Reconstruction of cooling system in Teplárna E2 -
I.Phase - Cooling tower Nr.1,2,3 New control system,


Turkey, NUH ENERJI – ISTAMBUL 2005/2006

Cogeneration Plant 59 MWe of total power output

2 x GT GE 48,8 MWe + 2 x HRSG dual pressure + 1 x ST 26 MWe


Germany, IPO OBERBRUCH 2005/2006

New Cogeneration Plant based on GE LM6000 gas turbine-generator (GTG), with associated one Delivery and assembly of Heat Recovery Steam Boiler 46 t/h of steam


The Netherlands , DOW CHEMICAL COMPANY 2006

New Cogeneration Plant based on GE LM6000 gas turbine-generator (GTG), Heat Recovery Steam Boiler 46 t/h of steam ,


Slovak Republic, Nuclear station, EBO J. Bohunice 2006

Stanby heating Plant HKB boilers 3 x 36 t/hr. Of steam with accesssories

"on key" form On base of contract BIDSF 0031009-A5B2/IEG-PMU


Bulgaria , Pleven 2007

Cogeneration Unit with GTG LM 2500 32,5 Mwe + HRSG 73t/hr.

With supplementary firing, 440°C; 39 barg,Control system, and electro part


Lithuania – Panevezio 2007/2008

New Cogeneration Plant based on GE LM6000 gas turbine-generator (GTG) with associated one heat recovery steam generator HRSG , Parameters: 40 t/hr; 6,52MPa; 482 °C


England, United Kingdom - Wilton Teesside 2008/2009

New Cogeneration Plant based on GE LM6000 gas turbine-generator (GTG) with associated one heat recovery steam generator (HRSG) 188t/hr.With supplementary firing, 385°C; 98 barg,


Czech Republic, Steelworks Třinec 2009/2010

New boiler for metalurgy 4 gases of power 80 t/hr., 495°C, 12 MPa,


Russia, Mordovcement 2010

New Cogeneration Plant based on one (2) GE LM2500+ gas turbine-generator (GTG) with associated one (1) heat recovery steam generator (HRSG).


Slovakia, Považská Bystrica 2011

New Cogeneration Plant based on one GE LM6000 gas turbine-generator (GTG) with associated one heat recovery steam generator (HRSG) and STG Siemens.

Parameters: 44 t/hr; 6MPa; 440 °C


Russia, Syzraň 2012

New 220MW Cogeneration Plant based on 2 x 75MW GE Heavy duty gas turbine-generator (GTG) with 2 x associated one heat recovery steam generator (HRSG) and 1x 70MW STG Siemens.

Parameters: HP : 120 t/hr; 8MPa; 540 °C, LP : 20t/h, 0,55 MPa, 220°C


Slovak Republic, Power Plant TEKO Košice, 2012/2013

New Coal Steam boiler 120 t/h, 13,5 MPa, 540°C


Extension of SCPP at Obajana, DANGOTE Nigeria2013

1 x Gas turbine generator (GTG) GE LM6000PC Sprint


Extension of SCPP at IBESE, DANGOTE Nigeria, 2014

2 x Gas turbine generator (GTG) GE LM6000PC Sprint


Heat Recovery Steam Generator Pakistan 2014

Steam parameters: HP steam: 57 bar(a) / 408°C / 91 tph; LP steam: 7 bar(a) / 242°C / 31 tph

GTG type: 2 x GE LM6000 PC sprint, Steam turbine GE 35MW - France

Installation: Korangi CCPP, Karachi - Pakistan

HRSG supply by: Istroenergo Group, a.s. (IEG)



Works for FICHTNER – ENERGY Company /MCC- Energy :

Czech Republic, Chemical Company LOVOCHEMIE , 2015

Supply by : ČKD Praha/MCC - Energy

Fluidized bed boiler with capacity 120 t/h of steam , 100 bar a, 535°C, Steam turbine Siemens 27MW,

Installation : LOVOCHEMIE a.s. Lovosice


Czech Republic , Power Plant CHotíkov 2016 

Supply by : ČKD Praha /MCC - Energy

Boiler for waste combuscion : 40 t/h, 50 barg, 420°C, Steam turbine Siemens 10,5 MW,

Installation: Prvá Teplárenská Plzeň a.s.


Work for Slovenské Elektrárne a.s.

Slovak Republic, Nuclear power plant, EMO Mochovce 2017-2026

Power plant unit 3 and unit 4, reactor VVER 440/V-213 , 2 x 470MW,

Main Supply by : ENEL , Slovenské Elektrárne,

Commissioning  for conventional island